MUNICIPAL DRINKING WATER

At a Glance

Aqua Engineering has constructed many municipal drinking water plants from containerized scale to large stationary scale in Europe, Africa, the Middle East and predominantly China.

The processes employed ranged from conventional processes up to advanced processes using DAF, slow sand filtration and membrane filtration to guarantee the appropriate technical solution for the site specific raw water quality, tailored to given drinking water directives in place.

Plants delivered range from 1.000 m3/d up to 400.000 m3/day and have been successfully delivered under EPC or M&E turnkey project contracts to mainly governmental customers.

Over time, Aqua Engineering has successfully delivered close to 50 plants of partly containerized and mainly stationary design with a total capacity of over 3.000.000 m3/d of purified drinking water production. The largest plant capacities installed are in China at Shantou with 400.000 m3/d production.

Some of the key projects references are further presented.

Projects

Sibiu City Drinking Water Plant, Sibiu, Romania

KEY DATA


Client: SC Apa Canl S.A. Sibiu

Contract: turnkey EPC, rehabilitation & upgrading

Commissioned: 2010

Capacity: 77.320 m3/d

Intake: river water

Treatment: inlet mixing, coagulation, sedimentation, gravity filtration, pumping station

PICTURES



Top^

Brasov City Drinking Water Plant, Brasov, Romania

KEY DATA


Client: Compania Apa R.A. Brasov

Contract: turnkey EPC, rehabilitation & upgrading

Commissioned: 2010

Capacity: 129.600 m3/d

Intake: river water

Treatment: pre-oxidation, flocculation, flotation, gravity filtration

PICTURES



Top^

Satu Mare City Drinking Water Plant, Satu Mare, Romania

KEY DATA


Client: SC Apaserv S.A. Satu Mare

Contract: turnkey EPC, rehabilitation

Commissioned: 2009

Capacity: 51.850 m3/d

Intake: ground water

Treatment: rapid iron filtration, aeration, manganese removal, backwash water tmt, pumping station

PICTURES



Top^

Buttoniga Drinking Water Plant, Region of Istria, Croatia

KEY DATA


Client: Vodoopskrbni Sustav Istre Vodovod Butoniga d.o.o.

Contract: turnkey EPC

Commissioned: 2001

Capacity: 86.400 m3/d

Intake: dam water

Treatment: pre-ozonation, flocculation, flotation, MM gravity filtration, ozonation, disinfection

PICTURES



Top^

Neijiang City Drinking Water Plant, Neijiang, China

KEY DATA


Client: Neijiang Running Water General Company

Contract: turnkey M&E,

Commissioned: 1997

Capacity: 135.000 m3/d

Intake: lake water

Treatment: flotation, sedimentation, MM gravity filtration, pumping stations

PICTURES



Top^

Shantou City Drinking Water Plant, Shantou, China

KEY DATA


Client: Guiyang Water Supply Company

Contract: turnkey M&E,

Commissioned: 1992

Capacity: 400.000 m3/d

Intake: river water

Treatment: intake, flocculation, sedimentation, MM gravity filtration

PICTURES